Supervisor, Integrated Planning and Scheduling (Hybrid) at Eversource Energy

Plymouth, Massachusetts, United States

Eversource Energy Logo
Not SpecifiedCompensation
Senior (5 to 8 years)Experience Level
Full TimeJob Type
UnknownVisa
Utilities, Energy, Electric PowerIndustries

Requirements

  • Expert level project and schedule management skills, including knowledge of scheduling tool, Primavera 5 or better
  • Knowledge of Construction Principles and Practices, Operations, Maintenance, Safety Standards and Business Processes
  • Working knowledge of labor contracts
  • Ability to use PC desktop applications (e.g. Microsoft Word and Excel)
  • Bachelor’s Degree in Engineering, Business Administration, related discipline or equivalent experience
  • Minimum of Five (5) years of experience in planning, scheduling or related field
  • Must be available to work emergency restoration assignment as required
  • Must be available to travel between MA/CT/NH as necessary

Responsibilities

  • Implementing the integrated master schedule and resource plan for all Substation/Transmission and Distribution Capital, Maintenance and Reliability Projects under the responsibility of Electric Operations
  • Providing master scheduling for district operations, Vegetation and Conduit, Substation Operations or Major Projects
  • Ensuring overall data integrity and adherence to scheduling standards
  • Maintaining cost templates, activity models and historical data to provide accurate estimates and forecasts
  • Working with district/substation management and Centralized Resource Planning to ensure that the required workload is completed in the most efficient and cost-effective manner
  • Adhering to prescribed timeframes for all capital, maintenance and compliance workload to maximize the productivity of district/substation operations
  • Monitoring district performance through utilization analyses
  • Maintaining and implementing the master work schedules for district operations, Vegetation and Conduit, Substation Operations or Major Projects
  • Maintaining data for the global templates used to create schedules and forecasts of future resource requirements
  • Tracking historical costs and durations for continuous improvement of work plan estimates
  • Working with the Senior Scheduling Supervisors and district/substation management to provide contingency plans for rebalancing the workload
  • Monitoring current and future workload to ensure district plans and schedules maximize productivity, control costs and meet or exceed service level agreements (SLA’s)
  • Monitoring district performance through analysis of manpower utilization and workload trends and productivity, and keeping district/substation management informed of results
  • Identifying, developing and implementing work process and best practices for overall planning and scheduling
  • Responsible for the integrity of data input into work management systems and operating databases

Skills

Key technologies and capabilities for this role

Master SchedulingResource PlanningIntegrated PlanningCost TemplatesActivity ModelsHistorical Data AnalysisWorkload ForecastingUtilization AnalysisProductivity MonitoringContingency Planning

Questions & Answers

Common questions about this position

What is the work arrangement for this role?

This is a hybrid role, with the first three months requiring full-time in the office. Work is performed primarily in an office environment.

What salary or compensation is offered for this position?

This information is not specified in the job description.

What skills and experience are required for this role?

Requires expert level project and schedule management skills including knowledge of Primavera 5 or better, knowledge of construction principles, operations, maintenance, safety standards, business processes, and working knowledge of labor contracts. Also needs ability to use PC applications like Microsoft Word and Excel, a Bachelor’s Degree in Engineering, Business Administration or related field, and minimum 5 years of experience in planning or scheduling.

What are the working conditions for this position?

Must be available to work emergency restoration assignments as required and to travel between MA/CT/NH as necessary. Work is performed primarily in an office environment.

What makes a strong candidate for this supervisor role?

A strong candidate will have a Bachelor’s Degree in Engineering or Business Administration, at least 5 years of experience in planning and scheduling, and expert skills in project management with Primavera, plus knowledge of construction practices, labor contracts, and Microsoft Office tools.

Eversource Energy

About Eversource Energy

N/AHeadquarters
N/AYear Founded
N/ACompany Stage

Land your dream remote job 3x faster with AI