IT Infrastructure Engineer at Kairos Power

Albuquerque, New Mexico, United States

Kairos Power Logo
Not SpecifiedCompensation
Junior (1 to 2 years), Senior (5 to 8 years)Experience Level
Full TimeJob Type
UnknownVisa
Information Technology & ServicesIndustries

Skills

Key technologies and capabilities for this role

NetworkingSystems EngineeringCloud Services (AWS, Azure, Google Cloud)Infrastructure as Code (IaC)Configuration Management (Terraform, Ansible, Puppet)Server-Client TechnologiesDatacenter OperationsPhysical and Logical Networking

Questions & Answers

Common questions about this position

Is this position remote or on-site?

The position is on-site at the Albuquerque, NM site.

What is the salary for this Infrastructure Engineer role?

This information is not specified in the job description.

What experience and skills are required for this role?

Candidates need 3+ years as a Network Engineer, Systems Engineer or similar in a medium/enterprise organization, 7+ years overall IT experience, proficiency in Windows, macOS, Linux, cloud platforms like AWS/Azure/GCP, and IaC tools like Terraform/Ansible.

What is the company culture like at Kairos Power?

The role requires a positive, enthusiastic, service-oriented attitude, prompt communication, excellent documentation skills, a resourceful problem-solver mentality, and the ability to thrive in a fast-paced environment with constant changes.

What makes a strong candidate for this Infrastructure Engineer position?

Strong candidates have 3+ years recent experience as a Network or Systems Engineer in enterprise settings, hands-on expertise with datacenter operations, cloud technologies, IaC tools, multiple OS platforms, plus soft skills like problem-solving and adaptability in fast-paced environments; experience in regulated industries is a plus.

Kairos Power

Designs and demonstrates advanced nuclear reactors

About Kairos Power

Kairos Power focuses on providing clean and affordable energy solutions through advanced nuclear reactor technology. Their main product, the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-FHR), is designed to be cost-competitive with natural gas while maintaining a near-zero carbon footprint and low water usage. This technology is aimed at utility companies, government agencies, and private firms seeking sustainable energy options. Unlike many competitors, Kairos Power emphasizes the integrated design, licensing, and demonstration of their reactors to prove their safety and reliability. Their goal is to attract investments and partnerships to scale their technology and contribute to a cleaner energy future.

Alameda, CaliforniaHeadquarters
2016Year Founded
$19.5KTotal Funding
GRANTCompany Stage
EnergyIndustries
201-500Employees

Benefits

Health Insurance
Dental Insurance
Vision Insurance
Paid Vacation
401(k) Company Match
401(k) Retirement Plan

Risks

Potential delays in Hermes 2 construction could affect timelines and finances.
Google partnership may face regulatory hurdles, impacting the 2035 rollout.
New Mexico expansion might encounter local regulatory challenges or community resistance.

Differentiation

Kairos Power's KP-FHR reactor offers near-zero carbon emissions and low water usage.
The company focuses on advanced nuclear technology, setting it apart from traditional energy firms.
Kairos Power's strategic partnerships, like with Google, enhance its market position.

Upsides

The U.S. NRC approved construction permits for Kairos Power's Hermes 2 Demonstration Plant.
Kairos Power's agreement with Google aims for 500MW nuclear projects by 2035.
The Inflation Reduction Act provides tax credits, boosting nuclear project financial viability.

Land your dream remote job 3x faster with AI