Senior Engineer, Power Plant Operational Design at Kairos Power

Albuquerque, New Mexico, United States

Kairos Power Logo
Not SpecifiedCompensation
Senior (5 to 8 years)Experience Level
Full TimeJob Type
UnknownVisa
Nuclear Energy, Clean Energy, Power GenerationIndustries

Requirements

  • Bachelors degree with 8+ years experience or Masters degree with 6+ years experience in Mechanical, Nuclear, Chemical, or other related engineering disciplines
  • Demonstrated ability of applying engineering knowledge to deliver results while being able to thrive in an environment with evolving requirements
  • Strong technical writing skills, with the ability to clearly document operational philosophies, assumptions, and technical decisions
  • Demonstrated ability to work as part of a team on problems as well as lead/coordinate the timely resolution of issues in cross functional teams
  • Fundamental understanding of power or industrial process plant operation and equipment and the interrelationships between them
  • Strong interpersonal skills and able to be independent, resourceful, and proactive in the face of the lack of information or unknowns
  • Desire and ability to function in a fast-paced small company environment while wearing multiple hats
  • Plant Performance - Proficient knowledge in power plant steady state performance, environmental effects on performance, tradeoffs, and understanding a variety of plant operational variability and uncertainties (strongly desired)
  • Plant Dynamics – Proficient knowledge in power plant maneuvering, control of closed-loop heat transport systems, transient thermodynamics and T-H, with a general understanding of plant dynamics, as well as familiarity with basic nuclear reactor kinetics operational constraints (strongly desired)
  • Plant Performance – Intermediate knowledge of economics of plant operation and plant reliability and availability management (strongly desired)
  • Plant Design – Intermediate knowledge of design constraints of key Structures, Systems, and Components (SSCs) including how operation drives component design, knowledge of how plant operational objectives and requirements drive overall design

Responsibilities

  • Develop and refine the plant’s detailed operational strategy, including operating modes, envelopes, and key state points, leveraging deep knowledge of plant performance requirements
  • Translate operational goals into actionable system- and component-level requirements for Structures, Systems, and Components (SSCs), balancing performance expectations and design constraints
  • Define anticipated and planned plant transients and collaborate with simulation teams to model and assess system responses and design adequacy
  • Collaborate closely with cross-functional design teams to inform and guide plant-level decisions, ensuring operational requirements and control strategies are incorporated
  • Support design optimization efforts aimed at enhancing plant performance, reliability, and availability while mitigating technical risks
  • Perform other duties as assigned

Skills

Power Plant Operations
Operational Design
Plant Transients
Systems Engineering
Nuclear Engineering
Process Engineering
Instrumentation and Control
Simulation Modeling
SSCs Requirements
FHR Design

Kairos Power

Designs and demonstrates advanced nuclear reactors

About Kairos Power

Kairos Power focuses on providing clean and affordable energy solutions through advanced nuclear reactor technology. Their main product, the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-FHR), is designed to be cost-competitive with natural gas while maintaining a near-zero carbon footprint and low water usage. This technology is aimed at utility companies, government agencies, and private firms seeking sustainable energy options. Unlike many competitors, Kairos Power emphasizes the integrated design, licensing, and demonstration of their reactors to prove their safety and reliability. Their goal is to attract investments and partnerships to scale their technology and contribute to a cleaner energy future.

Alameda, CaliforniaHeadquarters
2016Year Founded
$19.5KTotal Funding
GRANTCompany Stage
EnergyIndustries
201-500Employees

Benefits

Health Insurance
Dental Insurance
Vision Insurance
Paid Vacation
401(k) Company Match
401(k) Retirement Plan

Risks

Potential delays in Hermes 2 construction could affect timelines and finances.
Google partnership may face regulatory hurdles, impacting the 2035 rollout.
New Mexico expansion might encounter local regulatory challenges or community resistance.

Differentiation

Kairos Power's KP-FHR reactor offers near-zero carbon emissions and low water usage.
The company focuses on advanced nuclear technology, setting it apart from traditional energy firms.
Kairos Power's strategic partnerships, like with Google, enhance its market position.

Upsides

The U.S. NRC approved construction permits for Kairos Power's Hermes 2 Demonstration Plant.
Kairos Power's agreement with Google aims for 500MW nuclear projects by 2035.
The Inflation Reduction Act provides tax credits, boosting nuclear project financial viability.

Land your dream remote job 3x faster with AI