Electrical Engineering Internship - Summer 2026 at Kairos Power

Alameda, California, United States

Kairos Power Logo
Not SpecifiedCompensation
InternshipExperience Level
InternshipJob Type
UnknownVisa
Nuclear EnergyIndustries

Requirements

  • Current student enrolled and pursuing a B.S., M.S., or PhD in Electrical Engineering, Nuclear Engineering, Mechanical Engineering, Chemical Engineering or related field
  • Demonstrated application of technical skills outside of classroom setting through laboratory, research, extracurricular projects, personal projects, or prior internship/work experience (highly preferred)
  • Experience with control system software (LabVIEW, PLCs, etc.)
  • Knowledge of electrical and mechanical principles
  • Experience with control system analysis and design and control systems protocols (a plus)
  • Proficiency in Microsoft Office applications (Outlook, Excel, Word)
  • Self-starter with critical thinking and problem-solving skills
  • Proven team player with excellent verbal, written communication/presentation, and interpersonal skills
  • Ability to work well in an integrated collaborative team environment, including frequent interactions with cross-functional teams
  • Prioritizes and ensures safety of oneself and others
  • Ability to proactively collect, manage and transfer knowledge
  • Ability to remain in a stationary position, often standing or sitting for prolonged periods
  • Ability to move about to accomplish tasks or move from one worksite to another
  • Ability to communicate with others to exchange information
  • Ability to use hand tools
  • Ability to work in a general office environment, high-concentration, demanding and fast-paced setting
  • Ability to read and interpret hazardous warning signs
  • Ability to report issues with equipment or unsafe conditions
  • Ability to wear proper PPE, including face mask, face shields, gloves, safety shoes

Responsibilities

  • Assist in the design and implementation of control systems for the test reactor
  • Support measurement instrumentation and automated digital system process control
  • Collaborate with cross-functional teams to ensure effective integration of control systems
  • Participate in troubleshooting and optimizing control systems to enhance performance
  • Perform data collection, analysis, and documentation to support project needs
  • Contribute to the preparation and review of technical reports and presentations
  • Engage in continuous learning and professional development to stay current with industry trends
  • Support various engineering tasks, including testing, validation, and prototyping
  • Actively participate in team meetings, providing updates and contributing to discussions
  • Maintain clear and organized records of all work performed
  • Other duties as assigned

Skills

Control Systems
Measurement Instrumentation
Process Control
Data Analysis
Troubleshooting
Prototyping
Testing
Validation
Technical Documentation

Kairos Power

Designs and demonstrates advanced nuclear reactors

About Kairos Power

Kairos Power focuses on providing clean and affordable energy solutions through advanced nuclear reactor technology. Their main product, the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-FHR), is designed to be cost-competitive with natural gas while maintaining a near-zero carbon footprint and low water usage. This technology is aimed at utility companies, government agencies, and private firms seeking sustainable energy options. Unlike many competitors, Kairos Power emphasizes the integrated design, licensing, and demonstration of their reactors to prove their safety and reliability. Their goal is to attract investments and partnerships to scale their technology and contribute to a cleaner energy future.

Alameda, CaliforniaHeadquarters
2016Year Founded
$19.5KTotal Funding
GRANTCompany Stage
EnergyIndustries
201-500Employees

Benefits

Health Insurance
Dental Insurance
Vision Insurance
Paid Vacation
401(k) Company Match
401(k) Retirement Plan

Risks

Potential delays in Hermes 2 construction could affect timelines and finances.
Google partnership may face regulatory hurdles, impacting the 2035 rollout.
New Mexico expansion might encounter local regulatory challenges or community resistance.

Differentiation

Kairos Power's KP-FHR reactor offers near-zero carbon emissions and low water usage.
The company focuses on advanced nuclear technology, setting it apart from traditional energy firms.
Kairos Power's strategic partnerships, like with Google, enhance its market position.

Upsides

The U.S. NRC approved construction permits for Kairos Power's Hermes 2 Demonstration Plant.
Kairos Power's agreement with Google aims for 500MW nuclear projects by 2035.
The Inflation Reduction Act provides tax credits, boosting nuclear project financial viability.

Land your dream remote job 3x faster with AI